Project Description
Introduction to Concrete fence post machine:
- Concrete fence post machine can produce cement H shape column for fence wall.
- It use cement sand stone as materials, the Concrete fence post produced can be solid,hollow.
- Mainly for the fence wall connection for temporary plant, large farms.
- the common models are 150x150x2;180x240x2;200x220x2;220x270x2,etc.
Process chart of produce Precast Concrete fence post:
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
---|---|---|---|---|---|
Raw materials | Concrete batching machine | mixer machine | dumping feeder | steel tension machine | Concrete fence post machine |
How to produce Concrete fence post:
Beore production,Please prepare raw materials and steel wire, then clean production bed,Painting parting agent and Distribute the steel wire.After that, the production can start.
During production,
Firstly, Concrete batching machine start sand stone cement assignment proportion procedure ,After that materials can go into mixer machine to complete mixing.
Next, mixture materials will drop into feeding dumper from the mixer discharge port.
After that, feeding dumper will transport the materials to concrete fence post production bed. There, dump materials into the hopper of concrete fence post machine.
After that, Cement fence post machine will start to work along the rail.
Finally,the Precast Concrete fence post can come out, also the cutting machine can do cut 24 hour later.
About Curing conditions after production:
–For the temperature above 30 degrees,Please cover the concrete fence post surface with plastic film, blanket, straw curtain, etc. to keep moisture , in this way, it can prevent the water from volatilizing too fast, causing concrete fence post to appear cracking cracks.Besides,spray water for timely curing.
–For temperatures below 25 degrees,Put the concrete fence post in the open air, no need to cover to keep moisture. Besides, the concrete fence post surface should be sprayed to maintain moisture after demolding about 2-5 hours .
–When the temperature is about zero degrees, Please cover the concrete fence post surface for heat preservation and moisture retention, no need to spray water curing.
For below zero, better stopping production.
For The temperaturer is higher than about 25 degrees, Move the concrete fence post within 2-3 days after production.